Prado, J. P.
is a senior consultant at KBC Advanced Technologies in the UK. He holds a chemical engineering degree from the Universidad Simón Bolívar and master’s and doctoral degrees from the University of Manchester.
Control fouling on preheat trains with a two-stage approach
Maintenance & Reliability
/ Process Control
/ Refining
/ Corrosion
/ Heat Transfer
/ Information Systems
Fouling in heat exchanger preheat trains is a well-known problem in the refining industry.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- China’s Sinopec begins Xinjiang refining and chemical upgrading project 9/22
- bp abandons plans to build Rotterdam biofuels plant 9/22
- Kisuma Chemical boosts plastics recycling with suite of additive solutions 9/22
- VDMA: Industrial valves market grows by 8% in 1H of 2025 9/22
- Methanol Reformer, McAlpha and Ekora sign MoU to advance methanol-based hydrogen and power solutions in Turkey 9/22
- Lummus and Synthomer announce partnership to license acrylic acid esters technology 9/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction