Majumdar, K.
Requirements for successful cooling water pumping—lessons learned from a major failure
Mechanical design of the pump and system design of the installation are both equally important
Understand centrifugal compressor, equipment interaction
Operating scenarios provide insights into predicting behavior during changes
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC, AIQ developing first-of-a-kind agentic AI solution for global energy transformation 11/4
- SEEC to use thyssenkrupp nucera’s electrolyzer for caustic soda production 11/4
- Oman's OQ to list up to 49% stake in methanol, ammonia and LPG arm 11/4
- U.S. exports of ethane and ethane-based petrochemicals rose 135% from 2014 to 2023 11/4
- Cannon Artes breaks ground on massive industrial wastewater treatment/water reuse plant in Qatar 11/4
- LyondellBasell to close Houston refinery (U.S.) in Q1 2025 11/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction