Razalli, R. M.
Razmahwata Bin Mohamad Razalli is a Lead Engineer for IGL Services Sdn Bhd, and earned both BA and MEng degrees. With more than 25 yr of experience in the oil and gas industry in both design and operations, he has upstream and downstream experience in process safety, measurement and allocation, process engineering and offshore technical support, and is also a training provider. The author can be reached at razmahwata.razalli@igl.com.my.
Gas flaring system design and optimization with commercial simulation tool
In the chemicals, petroleum refining and natural gas industries, gas flaring systems are commonly installed for safe operation to burn associated and non-associated gases.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF introduces BDO, THF, PolyTHF and NMP product variants with reduced product carbon footprint 3/9
- Equilibrion and Rolls-Royce sign MoU to advance SAF using nuclear energy 3/9
- Iverson eFuels to discontinue green ammonia project in Norway due to grid capacity 3/9
- Hypersonix’s DART AE completes its first flight, reaching hypersonic speeds 3/9
- U.S. fuel exports see slight uptick in 2025 3/9
- South Australia to host HAMR Energy’s first-of-its kind methanol-to-jet fuel facility 3/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

