Kanda, A.
Amit Kanda is Project Manager at GTC Technology and has more than 15 yr of experience in process technology, detailed engineering and plant operations. He specializes in project execution and has managed several projects. He received a BS degree in chemical engineering from Thapar Institute of Engineering & Technology in India, and an MS degree in chemical engineering from the the Illinois Institute of Technology in Chicago.
Create a network of dividing wall columns in complex process units
The majority of dividing wall column (DWC) applications in the refining industry consist of standalone columns, whether a retrofit or a grassroots column.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction