Joyner, R.
Robert Joyner is a Principal Process Engineer at Fluor. He has more than 20 yr of experience in onshore and offshore oil and gas, refining and chemicals projects, specializing in overpressure protection and flare system design. He earned an MEng degree in chemical engineering from Imperial College London and is a chartered engineer with IChemE.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 2: CO2 as an energy storage medium
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Construction
/ Economics
/ Engineering & Design
/ Environment
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 1: CO2 as a refrigerant
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Compressors
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Heat Transfer
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Transition Industries signs agreements for the Pacifico Mexinol Project, an ultra-low carbon chemical production facility 7/3
- Bangkok Airways introduces SAF on commercial flights 7/3
- EcoCeres secures SAF contract with British Airways to help reduce carbon emissions 7/3
- Air Liquide to invest up to $200 MM in Louisiana, U.S. to support industrial growth 7/3
- MOL completes the acquisition of LBC Tank Terminals 7/3
- BHP awards charter contracts for two ammonia dual-fueled vessels 7/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction