Deshmukh, A.
Adya Deshmukh is a Senior Process Engineer at Fluor. She has more than 20 yr of experience, specializing in CO2 processing, including Econamine FG PlusSM, direct air capture and CO2 compression/conditioning process design. She graduated from the University of Surrey in chemical engineering and is a registered chartered engineer.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 2: CO2 as an energy storage medium
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Construction
/ Economics
/ Engineering & Design
/ Environment
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
Beyond sequestration: Changing CO2 from a problem to a solution—Part 1: CO2 as a refrigerant
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Carbon Management
/ Compressors
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Heat Transfer
As the world continues along its energy transition trajectory, demand for blue hydrogen and reduced carbon emissions will make high-purity carbon dioxide streams available in many process plants.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EIA forecasts new export licensing requirements will reduce U.S. ethane exports 6/18
- Nigeria to export first gasoline cargo to Asia from Dangote refinery 6/18
- Indian refiners cancel palm oil orders for July-September as prices surge 6/18
- U.S. set to object to green jet fuel recommendation at UN aviation council 6/18
- Phoenix Contact introduces intrinsic safety versions of the MINI Analog Pro Ex conditioners for hazardous areas 6/18
- EIA: U.S. crude inventories fall by most in a year, fuel stocks build 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction