Desai, J.
Jignesh Desai is a Senior Design Engineer for Materials and Welding in the Mechanical Engineering department at Fluor Daniel Pvt. Ltd. in New Delhi, India. He has more than 20 yr of experience in equipment and piping engineering (metallurgy, welding, fabrication, coating and testing) in the field of refinery, gas processing, petrochemical and power plant projects. He has five publications in his field, and earned a bachelor’s degree in metallurgical engineering from the Faculty of Technology and Engineering at the Maharaja Sayajirao University of Baroda in India. Additionally, his professional qualifications include International Welding Engineer from the International Institute of Welding, NACE Protective Coating Specialist–2 Advanced, and Lead Auditor QMS ISO 9001-2008 from IRCA.
Fabrication of clad equipment and piping—Part 2
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
Fabrication of clad equipment and piping—Part 1
For pressure vessels, heat exchangers and piping in corrosive services, the materials in contact with the process are often required to be high alloys to provide a reliable service life.
- 1
- ... 1 pages

- EPA's proposed eRIN program raises concerns and sparks legislative action 6/8
- Neste enables Swedish airport and Västflyg airline to become the world's firsts to use SAF on all flights 6/8
- Valtek Valdisk High Performance Butterfly Valve, completes million-cycle test 6/8
- The sustainable aviation fuel entrepreneurs poised for takeoff 6/8
- India's May fuel consumption soars on robust manufacturing 6/8
- Kent awarded three-year multi-site Master Services Agreement with TotalEnergies 6/8
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units