van Beurden, I.
The future of HAZOP study software: Break through the clutter
It is no secret that as part of its “CPL 03-00-014–PSM Covered Chemical Facilities National Emphasis Program,” the US Occupational Safety and Health Administration (OSHA) is conducting ..
Adopting global functional safety standards
Potential operational savings justifies the initial investment
Performing safety life cycle analysis helps mitigate process hazards
Using integrity levels and instrumented functions is necessary for safe process design
'Proven-in-use' criteria for safety instrumented systems
Use these guidelines to qualify equipment
Safety integrity level verification - A PFD average calculation is not enough
Architectural constraints must also be considered
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Hunt Refining's Tuscaloosa refinery (U.S.) expedites maintenance, repairs on fire-damaged coker unit 5/23
- SIBUR-Sinopec's Amur GCC expects to produce first polyethylene in Q3 2026 5/23
- Phillips 66's Los Angeles (U.S.) refinery layoffs to begin in December, sources say 5/23
- Nigeria's Dangote refinery agrees to export polypropylene with Vinmar 5/23
- ExxonMobil Joliet refinery (U.S.) running unit at reduced rate 5/23
- Suncor reports flare replacement project at the Montreal refinery in coming weeks 5/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction