Spencer, B.
Brian Spencer is a Staff Engineer at Enterprise Products responsible for Colorado and Wyoming assets, including three cryogenic gas processing plants. He has 26 yr of experience in the petrochemical industry.
Online monitoring of H2O using tunable diode laser absorption spectroscopy
Raw wellhead natural gas is a complex mixture of methane (CH<sub>4</sub>), hydrocarbon condensates, natural gas liquids (NGL), water, contaminants, hydrogen sulfide (H<sub>2</sub>S), carbon dioxide (CO<sub>2</sub>), nitrogen, mercury and other compounds.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Axens builds on ExxonMobil MTBE Decomposition Tech for high purity isobutylene production 6/7
- thyssenkrupp Uhde awarded supply of new uhde ammonia converter cartridge including synthesis catalyst by İGSAŞ 6/7
- Leak halts unit at Shell's Pernis oil refinery in Rotterdam 6/7
- Germany triggers EU investigation into Chinese biofuels 6/7
- Russian oil supplies to EU via southern Druzhba to rise 16% in June 6/7
- Aramco, ENI, United Airlines invest in UK-based low-carbon fuel venture 6/7
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction