Labhasetwar, S. G.
is a chemical engineer experienced in the design of oil, gas and petrochemical facilities. He holds a BS degree in chemical engineering from the Institute of Chemical Technology in Mumbai, India. He is a member of Engineers Australia and is a chartered professional engineer. He is also certified as an international professional engineer (Australia) and an APEC engineer, and he is a registered professional engineer of Queensland.
Protect tanks with pilot-operated vent valves
A number of devices are available for protecting low-pressure American Petroleum Institute (API) tanks against overpressurization. A case study demonstrates the need for the designer to analyze the en..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EPA finalizes historic new renewable fuel standards to strengthen American energy security 3/30
- The role of integrated biorefineries in achieving alternative fuel goals 3/30
- Czech government agrees to release 100,000 tonnes of crude from reserves 3/30
- Natural gas liquids exports reached record highs in 2025 3/30
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

