Siew, H.
Howard Siew is the Chemical Industry Manager at Endress+Hauser USA. He is responsible for the overall business development and growth of the company position related to the chemical industry. Mr. Siew is TϋV certified as a functional safety engineer in the area of SIS. He participates in an ISA84 working group, where he contributes expertise and also gains additional understanding of the latest industry standards to advise customers and colleagues. Mr. Siew has a degree in chemical engineering from Louisiana State University.
Increase uptime by reducing systematic failure risk
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Process Optimization
/ Refining
/ Analyzers
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Safety
Pondering the history of industrial incidents, it would be incorrect to assume that most failures occur randomly.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction