Wiens, M.
Megan Wiens is a Global Pressure Product Engineer for Emerson. She is responsible for new product introductions and advanced diagnostic capabilities across the Rosemount pressure portfolio. In this role, she works to implement product solutions that improve plant safety, increase process efficiency and enhance process insight. She earned a BS degree in chemical engineering and a BA degree in Spanish from the University of North Dakota and is currently pursuing an MBA from the University of St. Thomas, Minnesota.
Advancing the feature sets of field instruments to improve connectivity, diagnostics and user-friendliness
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Process Optimization
/ Analyzers
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ People
Anyone observing process industries these days recognizes that they are very competitive.
How Bluetooth® technology extends the capabilities and connectivity of wired instrumentation
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Refining
/ Environment
/ Equipment
/ Information Systems
/ People
/ Safety
One day at a refinery, operators call an instrument tech to the control room and point to the screen.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction