Younas, J.
Jabran Younas is the Senior Inspection Supervisor at EFERT. He has more than 17 yr of hands-on experience in the field of non-destructive testing and inspection of plant static equipment. He holds various API , ASNT and NCNDT certifications and has worked in different fertilizer and petrochemical units in Pakistan and the Middle East as a Senior Inspection Supervisor.
Aging pressure relief valves: Are you managing history well?
The risks associated with the malfunction or blockage of pressure safety valves (PSVs) are significant, and operating facilities invest heavily in preventive maintenance (PM) programs to mitigate the risks and ensure that PSVs are functioning exactly as per design requirements.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF introduces BDO, THF, PolyTHF and NMP product variants with reduced product carbon footprint 3/9
- Equilibrion and Rolls-Royce sign MoU to advance SAF using nuclear energy 3/9
- Iverson eFuels to discontinue green ammonia project in Norway due to grid capacity 3/9
- Hypersonix’s DART AE completes its first flight, reaching hypersonic speeds 3/9
- U.S. fuel exports see slight uptick in 2025 3/9
- South Australia to host HAMR Energy’s first-of-its kind methanol-to-jet fuel facility 3/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

