Younas, J.
Jabran Younas is the Senior Inspection Supervisor at EFERT. He has more than 17 yr of hands-on experience in the field of non-destructive testing and inspection of plant static equipment. He holds various API , ASNT and NCNDT certifications and has worked in different fertilizer and petrochemical units in Pakistan and the Middle East as a Senior Inspection Supervisor.
Aging pressure relief valves: Are you managing history well?
The risks associated with the malfunction or blockage of pressure safety valves (PSVs) are significant, and operating facilities invest heavily in preventive maintenance (PM) programs to mitigate the risks and ensure that PSVs are functioning exactly as per design requirements.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Brazilian sugarcane processors mulling switch to more ethanol production 5/19
- Fuji Oil cancels Japanese biofuels plant due to high construction costs 5/19
- Italy's Meloni warns EU green policies risk 'industrial desertification' 5/19
- Nuberg EPC, EDL sign technical collaboration agreement across several industries 5/19
- Infinium will deploy Electric Hydrogen’s HYPRPlant at large-scale eFuels facility in Texas (U.S.) 5/19
- Asian petrochemical producers chase ethane gains as margins dwindle 5/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction