Ashfaq Anwer
Ashfaq Anwer is an Inspection Professional with 15 yr of experience in ammonia-urea complexes, petrochemical units, and oil and gas industries. He has extensive expertise in material selection, corrosion mapping and control, fitness-for-service studies, defining inspection framework and implementing inspection plans for old and new units.
Preventive maintenance checks and optimization
In the hydrocarbon processing industry (HPI), if preventive maintenance is being performed and does not result in some insight related to the performance of the equipment or system, then that preventive maintenance is either not required or is being incorrectly directed.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Cognite launches Integrated Supply Chain offering to deliver more business value and operational resilience 6/17
- MyRechemical to license technology for Canadian biomass-to-SAF project 6/17
- Honeywell to provide technology for Acelen Renewable's SAF and renewable fuels facility in Brazil 6/17
- ACME signs investment agreement for $4.2-B green hydrogen/ammonia project in Oman 6/17
- Amogy and KOWA partner to provide ammonia cracking-based hydrogen supply in Japan 6/17
- IEA sees significant 2027 oil surplus after Hormuz recovery 6/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

