Ashfaq Anwer
Ashfaq Anwer is an Inspection Professional with 15 yr of experience in ammonia-urea complexes, petrochemical units, and oil and gas industries. He has extensive expertise in material selection, corrosion mapping and control, fitness-for-service studies, defining inspection framework and implementing inspection plans for old and new units.
Preventive maintenance checks and optimization
In the hydrocarbon processing industry (HPI), if preventive maintenance is being performed and does not result in some insight related to the performance of the equipment or system, then that preventive maintenance is either not required or is being incorrectly directed.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Clariant's FAMAX™ catalysts deliver outstanding performance at two Yihua formaldehyde plants in China 5/27
- Aramco and Emerson collaborate on strategic corrosion R&D 5/27
- Clariant catalysts continue to shrink customer footprints: 45M tons of CO2e avoided in 2025 5/26
- Mitsubishi Chemical Group considers spinning off petrochemicals business 5/26
- Hitachi Energy and Volvo Construction Equipment announce collaboration to accelerate zero-emissions construction sites 5/26
- Aramco and PETRONAS Announce Transfer of Full Ownership of PRefChem to PETRONAS 5/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

