Abid, J.
Jamshaid Abid is a Piping/Project Engineer with more than 16 yr of experience in project design, engineering, installation and commissioning for onshore oil and gas (greenfield and brownfield developments) and ammonia-urea plants in Iraq, Pakistan, the UAE and Yemen. He holds a BE degree in mechanical engineering from the University of Engineering and Technology in Taxila, Pakistan.
Supply Chain: How to reduce piping inventory
Piping represents a significant part of the plant cost, ranging from 15%–25%.1 Materials stored in warehouses or storage facilities cost companies in terms of personnel, materials, time, space, insurance, risk, etc. This article proposes cost-saving strategies for inventory reduction. Further, it emphasizes consistent naming conventions to avoid creating duplicate/redundant items.
Project Management: Estimate skid and package dimensions
In the absence of vendor quotations or detailed engineering, preliminary dimensions of skids or packages can be estimated quickly using the ratio method.
- 1
- ... 1 pages
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
- Asia 10-ppm sulfur diesel margin hits record high 3/27
- South Korea enforces naphtha export ban amid Middle East supply disruptions 3/27

