Nick, P.
Peter Nick has 30 yr of simulation and process design experience at refineries and petrochemical plants. His primary expertise is in process simulation and modeling of refinery process units, with positions at Unocal, Phillips 66, Fluor and Worley Parsons. He is also the author of several publications in process design methods.
Upgrading the bottom of the barrel
Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment & Safety
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Products
/ Pumps
/ Reactors
/ Sulfur
/ Treating
/ Utilities
/ Refining
In the past few decades, new technologies, including both carbon rejection methods and catalytic conversion methods, have emerged.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- China's first coal-to-chemicals project with green hydrogen starts commercial operations 11/20
- Norsk e-Fuel and Braskem partner to turn captured carbon into long-lasting products 11/20
- Nigeria's Dangote refinery delays CDU maintenance to end of January 2026 11/20
- Technimont attends ground-breaking ceremony of Tengiz Gas separation Complex in Kazakhstan 11/20
- 42% of U.S. energy/critical infrastructure providers exposed to weaponized AI and email attacks 11/20
- EIA: U.S. crude stocks fall on higher demand, fuel inventories rise 11/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

