Gollin, M.
Purging and inerting large-volume tankage and equipment-jet mixing concept-Part 2
Recommendations for the design, installation and testing of jet mixing systems
Purging and inerting large-volume tankage and equipment—jet mixing concept—Part 1
Here are the advantages and disadvantages of the various methods
Applying temperature-activated relief devices
Follow these system design and installation guidelines
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Wartsila secures China’s largest-ever methanol newbuild order 4/26
- Aspen Technology introduces new strategic planning for sustainability pathways solution 4/26
- Imperial Oil gets Q1 boost from higher production; refining throughput weighs 4/26
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
- Nigeria's NNPC partners local firm on new 100,000 bpd refinery 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction