Suresh, V.
V. Suresh holds a graduate degree in chemical engineering and has worked for 33 yr within Bharat Petroleum Corp. Ltd.’s Mumbai Refinery. His work has spanned various sectors, including technical services, optimization and operations, and control and optimization of refinery process units. That focus includes AspenTech’s DMC3 and the RMPCT of Honeywell Advanced Solutions. Mr. Suresh is jointly responsible for the implementation of APC in all of the refinery’s process units.
Advanced process control for unsteady-state operation: A lesser-known technique
A goal of all process industries is to run the plant in a steady-state zone of operation, improving optimization and control, and producing more benefits.
Automation: Significant improvement of soft sensor estimation by automation in bias correction
The main objective of any industry is to operate as close as possible to the point where profits are maximized.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Carbon capture tops agenda at GPAE Conference 2025 6/17
- INEOS to cease phenol production at German site, cites high European energy costs and CO2 tax policy 6/17
- Petrobras signs $892 MM in contracts to complete RNEST Train 2 refinery expansion 6/17
- China's May refinery throughput at 9-month low on plant overhauls (1) 6/17
- bp completes turnaround work at 250,000-bpd refinery in Washington (U.S.) 6/17
- Japan's Eneos restarts 77,000-bpd Kawasaki CDU after unplanned shutdown 6/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction