O'Hearn, S.
Shawn O’Hearn is an Inspection Engineer supporting deepwater operations in the GoM for BP America. He has more than 10 yr of experience in inspection, integrity management and mechanical engineering in the upstream and midstream oil and gas industry.
Optimize your insulation to reduce costs
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Piping
/ Safety
/ Americas
Corrosion under insulation (CUI) is a common problem that is shared by the oil and gas (onshore and offshore), refining, petrochemical, power and manufacturing industries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Air Canada and Airbus launch joint initiative to scale domestic Canadian SAF 8/3
- Purdue Biofuels Consortium to bring biodiesel and ethanol blends to diesel engines 8/3
- Convertus closes on $135-MM financing for flagship biofuel facility in Ontario, Canada 8/3
- New process turns mixed plastic waste into hydrogen fuel without sorting 8/3
- Amogy and 2G Energy successfully demonstrate integrated ammonia-to-power generation with natural gas multi-fuel capability 8/3
- Iraq's Baiji refinery output unaffected by fire 8/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

