Schleiffer, A.
Optimize field upgrading of oil sands with slurry-phase combi-cracking technology
Slurry-phase combi-crackers are able to process a much wider range of feeds—including those with very high levels of metals, asphaltenes and sulfur—that cannot be economically upgraded in fixed-bed or ebullated-bed reactors, which makes this process ideal for upgrading oil sands.
Maximize liquid yield from extra heavy oil
Next-generation hydrocracking processes increase conversion of residues
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Repsol selects Honeywell Ecofining Technology for biofuel production in Spain 10/3
- AFPM Summit 2023 – Excellence and Plant Performance 10/3
- Carbon Recycling International and Jiangsu Sailboat start up world’s most efficient CO2-to-methanol plant 10/3
- AWS launches process optimization solution for downstream and midstream operations 10/3
- ADNOC to be first company in the Middle East to receive ISCC Certification to produce SAF 10/3
- Malaysia mulls expansion of B10 biodiesel usage to industrial sector 10/3
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction