Ellrich, J.
Justin Ellrich is a Principal Process Engineer for Black & Veatch’s energy resources business and serves as the LNG Systems Leader, lending technical expertise and project guidance across the department and company. He is experienced in designing both grassroots and revamp facilities for cryogenic processing and incorporating project estimates and schedules into detailed economic models.
Electric drive LNG can grow with the clean energy transition
As companies across markets set aggressive decarbonization goals and sustainability commitments to align with changing regulations and consumer demands for greener energy and fuel, the liquefied natural gas (LNG) industry is searching for ways to lower emissions.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Russia's Ryazan oil refinery restores crude processing to 60% of pre-attack level 3/28
- Global refinery capacity totaling 3.6 MM bpd at high-risk of closure 3/28
- More than 20% of global oil refining capacity at risk, analysis finds 3/28
- SABIC Fujian Petrochemicals advances major ethylene project with Lummus technologies and services 3/28
- Singapore fuel oil stockpiles slip to two-week low 3/28
- Sri Lanka minister says Sinopec to start work on refinery by June 3/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction