Fleshman, J.
Jim Fleshman is a Principal Consultant with Arivergy LLC. Most of his 39 yr of industry experience was with Foster Wheeler USA. He has extensive process design, technology and engineering expertise in the areas of hydrogen/syngas, gas treating, natural gas liquefaction and sour water stripping/amine treating, as well as in process design packages, revamp design and engineering, troubleshooting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EPA finalizes historic new renewable fuel standards to strengthen American energy security 3/30
- The role of integrated biorefineries in achieving alternative fuel goals 3/30
- Australia’s biggest LNG plants suffer outages due to cyclone, straining global supply 3/27
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/27
- Stockholm Exergi taps Inprocess to deliver advanced process simulator for BECCS project 3/27
- Japan to relax rules from April to boost coal-fired power amid LNG import risks 3/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

