Fleshman, J.
Jim Fleshman is a Principal Consultant with Arivergy LLC. Most of his 39 yr of industry experience was with Foster Wheeler USA. He has extensive process design, technology and engineering expertise in the areas of hydrogen/syngas, gas treating, natural gas liquefaction and sour water stripping/amine treating, as well as in process design packages, revamp design and engineering, troubleshooting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- IRPC extends abstracts deadline following strong industry interest 4/7
- BDI signs contract with Ghent Renewables for the construction of a new biofuel feedstock pre-treatment plant 4/7
- Update: IATA airlines chief warns aviation industry falling behind on net-zero 4/7
- Improved recycling of plastic from packaging waste 4/7
- India not to raise petrol, diesel retail prices despite tax hike 4/7
- China teapot oil refiners improve run rates but demand woes, sanctions weigh 4/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction