Fleshman, J.
Jim Fleshman is a Principal Consultant with Arivergy LLC. Most of his 39 yr of industry experience was with Foster Wheeler USA. He has extensive process design, technology and engineering expertise in the areas of hydrogen/syngas, gas treating, natural gas liquefaction and sour water stripping/amine treating, as well as in process design packages, revamp design and engineering, troubleshooting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF introduces BDO, THF, PolyTHF and NMP product variants with reduced product carbon footprint 3/9
- Equilibrion and Rolls-Royce sign MoU to advance SAF using nuclear energy 3/9
- Iverson eFuels to discontinue green ammonia project in Norway due to grid capacity 3/9
- Hypersonix’s DART AE completes its first flight, reaching hypersonic speeds 3/9
- U.S. fuel exports see slight uptick in 2025 3/9
- South Australia to host HAMR Energy’s first-of-its kind methanol-to-jet fuel facility 3/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

