Sheilan, M.
Mike Sheilan is the Co-founder of Amine Experts and is the Senior Principal Engineer for Amine Experts and Dehydration Experts. For 41 yr, he has provided training and consulting services in hydrate control, gas dehydration, gas and liquid sweetening, hydrocarbon recovery and sulfur plant operations.He is a co-author of the industry reference textbook Amine Treating and Sour Water Stripping.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asia refineries, petchem firms cut runs as Middle East conflict disrupts feedstock supplies 3/6
- Hungary's MOL says capacity tests on Adria pipeline to start next week 3/6
- Brazil's antitrust watchdog approves private equity firm's controlling stake purchase in Braskem 3/6
- Shell-CNOOC China JV to close 1.2-MMtpy steam cracker due to feedstock disruption 3/6
- India invokes emergency powers, orders refiners to boost LPG output 3/6
- Russia gets export boost from Iran war as price of oil to India surges 3/6
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

