Sheilan, M.
Mike Sheilan is the Co-founder of Amine Experts and is the Senior Principal Engineer for Amine Experts and Dehydration Experts. For 41 yr, he has provided training and consulting services in hydrate control, gas dehydration, gas and liquid sweetening, hydrocarbon recovery and sulfur plant operations.He is a co-author of the industry reference textbook Amine Treating and Sour Water Stripping.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Corteva and bp launch biofuel feedstock joint venture Etlas™ 1/7
- BASF starts up 1-MMtpy ethane cracker at Verbund site in Zhanjiang, China 1/7
- Larsen & Toubro delivers first feed to HPCL's 3.55-MMtpy LC-Max residue upgrading facility 1/7
- Borouge advances industry-first AI autonomous operations at Ruwais facility 1/7
- U.S. refiners to benefit from Venezuelan crude oil imports 1/7
- Verdant Specialty Solutions completes acquisition of Lubrizol’s Elmendorf, Texas (U.S.) manufacturing and R&D assets 1/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

