Gentry, M. R.
Matthew R. Gentry has worked for Airflow Sciences Corp. for more than 15 yr, performing flow modeling as well as laboratory and field testing. He has served as project manager for heat recovery steam generators, waste heat recovery units, selective catalytic reduction and sorbent injection projects, helping optimize performance and pollution control in a wide variety of industrial applications. Mr. Gentry received his MSE degree in Aerospace Engineering from the University of Michigan in 2004, with a specialization in structural mechanics.
Flow modeling as a tool for WHRU performance optimization
Process Optimization
/ Refining
/ Petrochemicals
/ Gas Processing/LNG
/ Heat Transfer
/ Carbon Management
/ Environment & Safety
/ Information Systems
Greenhouse gas (GHG) emissions have become a growing concern for many industrialized countries over the past few years.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Toyota unit Hino Motors reaches $1.6-B U.S. diesel emissions settlement 1/16
- Update: Colonial Pipeline's main U.S. gasoline artery likely shut until Friday 1/16
- EIA: U.S. crude stocks fall, gasoline and distillate inventories rise 1/16
- South Korea considering buying more U.S. oil and gas 1/16
- Shell, CNOOC take FID on 1.6-MMtpy petrochemical complex expansion in China 1/15
- Plug Power seals huge deal with Allied Green Ammonia for 3-GW electrolyzer system 1/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction