Gentry, M. R.
Matthew R. Gentry has worked for Airflow Sciences Corp. for more than 15 yr, performing flow modeling as well as laboratory and field testing. He has served as project manager for heat recovery steam generators, waste heat recovery units, selective catalytic reduction and sorbent injection projects, helping optimize performance and pollution control in a wide variety of industrial applications. Mr. Gentry received his MSE degree in Aerospace Engineering from the University of Michigan in 2004, with a specialization in structural mechanics.
Flow modeling as a tool for WHRU performance optimization
Process Optimization
/ Refining
/ Petrochemicals
/ Gas Processing/LNG
/ Heat Transfer
/ Carbon Management
/ Environment & Safety
/ Information Systems
Greenhouse gas (GHG) emissions have become a growing concern for many industrialized countries over the past few years.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Evonik launches high performance isodewaxing catalysts for fuels and lubricants production 4/16
- BASF to increase its price for neopentylglycol in the U.S. and Canada 4/16
- AMETEK Process Instruments announces additions to next-gen quartz crystal microbalance moisture analyzer line 4/16
- Brenntag Energy Services announces designated distributorship with BASF for Keropur fuel performance additives in continental Europe 4/16
- Shell restarts crude unit at Pernis oil refinery 4/16
- Nigerian airlines threaten to halt flights over soaring jet fuel prices 4/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

