Schmidt, W. P.
William P. Schmidt is the Technology Manager for LNG Process Engineering. This includes developing and maintaining the process design methods, project and field support, technical risk management, and troubleshooting. Mr. Schmidt has 43 years of process engineering experience, including air separation, non-cryogenic gas separations, computer model development, and the past 14 years have been in LNG. He is co-inventor on 11 US patents and has 44 external publications. He received Chemical Engineering degrees from Case Western Reserve University (B.S.) and Lehigh (M.S.).
Take the mystery out of running your LNG plant
Gas Processing/LNG
/ Process Control
/ Process Optimization
/ Refining
/ Compressors
/ Engineering & Design
/ Heat Transfer
/ Information Systems
/ Natural Gas
Many natural gas liquefaction plants with production capacities ranging from 0.5 MMtpy to 8 MMtpy use mixed refrigerants to cool and liquefy the feed.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Corteva and bp launch biofuel feedstock joint venture Etlas™ 1/7
- BASF starts up 1-MMtpy ethane cracker at Verbund site in Zhanjiang, China 1/7
- Larsen & Toubro delivers first feed to HPCL's 3.55-MMtpy LC-Max residue upgrading facility 1/7
- Borouge advances industry-first AI autonomous operations at Ruwais facility 1/7
- Verdant Specialty Solutions completes acquisition of Lubrizol’s Elmendorf, Texas (U.S.) manufacturing and R&D assets 1/7
- Valero to keep importing gasoline after Benicia (U.S.) refinery closure 1/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction