Schmidt, W. P.
William P. Schmidt is the Technology Manager for LNG Process Engineering. This includes developing and maintaining the process design methods, project and field support, technical risk management, and troubleshooting. Mr. Schmidt has 43 years of process engineering experience, including air separation, non-cryogenic gas separations, computer model development, and the past 14 years have been in LNG. He is co-inventor on 11 US patents and has 44 external publications. He received Chemical Engineering degrees from Case Western Reserve University (B.S.) and Lehigh (M.S.).
Take the mystery out of running your LNG plant
Gas Processing/LNG
/ Process Control
/ Process Optimization
/ Refining
/ Compressors
/ Engineering & Design
/ Heat Transfer
/ Information Systems
/ Natural Gas
Many natural gas liquefaction plants with production capacities ranging from 0.5 MMtpy to 8 MMtpy use mixed refrigerants to cool and liquefy the feed.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Uniper, thyssenkrupp Uhde partner to build large-scale ammonia cracker in Germany 5/27
- Wood selected as project management consultancy for first major methanol plant in the UAE 5/27
- Indian refiner Reliance's April Russian oil imports up 55% m/m 5/27
- Canada shift crude oil exports to China, an unintended consequence of U.S. energy tariffs 5/27
- Libya says oil leak occurs in pipeline south of Zawiya city 5/27
- Eni in talks with GIP for sale of 49.99% of carbon capture unit 5/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction