Determine the design metal temperature for a secondary reformer
An air-burning system should be designed so that there is no maintenance required between scheduled shutdowns every two years. To achieve this, a metal temperature study should be carried out for the design of the pressure parts and for the refractory design.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.