M. Y. Iqbal
Muhammad Yousuf Iqbal is the Principal Engineer, Process, at Worley Engineering Oman, and has more than 19 yrs of experience in conceptual design and plant optimization. He has led multiple projects in the oil and gas segment, including gas sweetening and dehydration, gas compression, gas transmission lines and crude separation, stabilization, manifolds design, and enhanced and design plant utilities, particularly steam, fuel gas, sour water stripper, sulfur recovery unit (SRU) basic design and enhancement. Iqbal has contributed his engineering skills to clients around the globe.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 and Kinder Morgan announce open season extension for Western Gateway refined products pipeline 3/25
- Econotherm awarded contract for heat pipe heat exchanger in a Thai refinery 3/25
- Tecnimont awarded $50-MM rehab study contract for Guaracara refinery upgrade project 3/25
- Japanese refiners raise runs as stockpile release begins 3/25
- HyOrc signs binding agreement for European waste-to-methanol project 3/25
- Vietnam's Nghi Son refinery has crude oil for uninterrupted operations until end of May 3/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

