Dınçer, A. R.
Asli Reyhan Dınçer is the Simulation Section Leader at TÜPRAŞ headquarters within the process and equipment development department. She previously worked as a process engineer for Foster Wheeler, and has 13 yr of experience in the oil and gas industry. She holds a BSc degree in chemical engineering from Yıldız Technical University and an MBA from Koç University. The author can be reached at Asli.Reyhan@Tüpraş.com.tr
CO2 emissions reduction via a pinch study in a vacuum distillation unit
The project detailed here was carried out on a vacuum distillation unit (VDU) in the TÜPRAŞ İzmir refinery.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

