Dınçer, A. R.
Asli Reyhan Dınçer is the Simulation Section Leader at TÜPRAŞ headquarters within the process and equipment development department. She previously worked as a process engineer for Foster Wheeler, and has 13 yr of experience in the oil and gas industry. She holds a BSc degree in chemical engineering from Yıldız Technical University and an MBA from Koç University. The author can be reached at Asli.Reyhan@Tüpraş.com.tr
CO2 emissions reduction via a pinch study in a vacuum distillation unit
The project detailed here was carried out on a vacuum distillation unit (VDU) in the TÜPRAŞ İzmir refinery.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Indonesia's Danantara awards $8-B EPC contract for modular refinery builds 7/22
- ABB wins a contract to support the electrification of Azerbaijan oil and gas terminal facility 7/22
- Gasoline cars banned ride-hailing platforms in Beijing 7/22
- bp-chartered tanker leaves port of Nayara Energy without loading diesel 7/22
- Britain's Lindsey oil refinery to close after no buyer found 7/22
- Data and digital: TotalEnergies and Emerson sign a strategic collaboration to boost the value of industrial data 7/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction