Aykut Avci, İ
İsmail Aykut Avci started his professional career in 2007 as a Production Engineer at Borusan Mannesmann’s İzmit factory. He joined the Tüpraş İzmit refinery in 2010 and has worked as a Maintenance Engineer, Reliability Chief Engineer and Maintenance Chief Engineer. Mr. Avcı has been working as Maintenance Superintendent since May 2016, responsible for the maintenance and repair of rotating equipment. He graduated from the Istanbul Technical University (ITU) Mechanical Engineering Department in 2007 and completed his MS degree in mechanical engineering at ITU in 2010.
Chemical treatment program for closed-loop cooling system
Closed-loop cooling water (CLCW) systems are utilized in areas where cooling is critical.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge set to boost production capacity to over 6.6 MMtpy 4/28
- Sri Lanka to begin talks with India, UAE for new energy hub 4/28
- S-Oil posts refining, petrochemical losses; expects US tariffs to affect margins in Q2 4/28
- Kuwait Petroleum's stake investment in China Wanhua Chemical's unit valued at $638 MM 4/28
- Chemical maker LyondellBasell misses quarterly profit estimates on weak volumes 4/28
- Trump administration (U.S.) to allow temporary sales of summertime higher-ethanol fuel 4/28
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction