Allah, W. K.
Wesam Khalaf Allah is a Saudi Aramco Engineer specialized in rotating equipment. He is currently a graduate mechanical engineering student at Texas A&M University.
Intensive study on damaged wear rings of centrifugal pumps—Part 2
This article is a continuation of Part 1, which discussed the evaluation of two damaged wear rings from centrifugal pump applications—a stationary (inner) ring and a rotating (outer) ring.
Intensive study on damaged wear rings of centrifugal pumps—Part 1
This article is based on damaged wear rings from centrifugal pump applications.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- INEOS' CEO, Jim Ratcliffe, calls on European politicians to make 11th hour intervention to save Europe's chemical industry 10/9
- NTPC carbon capture project produces first drop of methanol using captured CO2 10/9
- Clariant unveils titanium-based catalyst solutions for more sustainable polyester production 10/9
- Solvay achieves near-total water independence, with Veolia’s advanced reuse technologies and tailored long-term service agreement in Brazil 10/9
- Aramco completes acquisition of additional stake in Petro Rabigh 10/9
- FourPoint Resources, Energy Transfer to facilitate expansion of Price River Terminal in Utah (U.S.) 10/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction