Ruiz, J. P.
is the optimization specialist and senior developer at Soteica Visual MESA. He obtained his BS degree in chemical engineering at the Universidad Tecnologica Nacional (UTN) in 2003 and his PhD in chemical engineering (process optimization) at Carnegie Mellon University (CMU) in 2011. Dr. Ruiz has more than 10 years of experience developing and implementing computer-aided tools to improve the design and operation of industrial processes.
Reducing energy costs while improving efficiency
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Loss Prevention
Better energy management can make the difference between profit and losses. The question facing owner-operators is: how to reduce energy costs while satisfying site energy needs?
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction