Arana, T.
Based in Houston, Texas, Tony Arana is the Southwest Territory Sales Manager at SIFCO ASC. He has more than 30 yr of experience in surface plating and chemical engineering in the oil and gas, aerospace, power generation and general industries.
Down with downtime: Repair complex petrochemical components with selective electroplating
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Valves
/ Americas
The volatile impact of the coronavirus pandemic hit at the same time the petrochemical industry was entering a downcycle.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 and Kinder Morgan announce open season extension for Western Gateway refined products pipeline 3/25
- Econotherm awarded contract for heat pipe heat exchanger in a Thai refinery 3/25
- Tecnimont awarded $50-MM rehab study contract for Guaracara refinery upgrade project 3/25
- Japanese refiners raise runs as stockpile release begins 3/25
- HyOrc signs binding agreement for European waste-to-methanol project 3/25
- Vietnam's Nghi Son refinery has crude oil for uninterrupted operations until end of May 3/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

