Sela, U.
Effective machinery monitoring: getting the most for your investment
Here's why, when, where and how to make the effort
Reciprocating compressor condition monitoring
Ensure your system includes these capabilities
Quality machinery installation doesn't have to cost more
Facilities design tips improve maintenance
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- NETL goes deep to develop new biocatalysts for carbon conversion 6/9
- Shell pivots back to oil to win over investors 6/9
- Iberdrola steps up green ammonia plans with $808.05-MM project 6/9
- A consortium led by Tecnimont awarded a $300-MM EPC contract for a fertilizer plant in Egypt by KIMA 6/9
- New York lawmakers weigh clean fuel standard as legislative session ends 6/9
- Nigerian regulator links Exxon to illegal lifting of petroleum from terminal 6/9
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction