Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- HIF Global and German eFuel One GmbH sign HoA for e-methanol offtake 2/20
- Venezuela's refineries boost processing to 35% of capacity 2/20
- New Trinidad gas projects could provide necessary feedstock for country's petchem and LNG sectors 2/20
- MK-Polymer delivers ethylene-propylene rubber to JSC Kazenergokabel 2/20
- Mexican authorities shut down 22-m long tunnel used in illegal smuggling of fuel supplies 2/20
- Digital Feature: First-stage ejector nozzle retrofit achieves meaningful performance improvement 2/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

