Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sponsored Content: Demystifying industrial AI agents: What we can learn from Iron Man 11/1
- LyondellBasell misses quarterly profit estimates on falling refining margins 11/1
- ExxonMobil sells French Fos-sur-Mer refinery to Trafigura consortium 11/1
- Drone crashes on oil depot in Russia's Stavropol region 11/1
- Lummus and Advanced Ionics establish partnership for green hydrogen 11/1
- Consortium to launch world's first commercialized PET bottle using bio-paraxylene 10/31
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction