Al-Sanad, A. (1)
ABDULLMAJEED AL-SANAD is a process engineer at Saudi Aramco's Process and Control Systems Department, Flare and Relief Systems Group. Al-Sanad has 6 yr of experience with Saudi Aramco, including company operations and project support. He also participates in a flaring minimization program, including several aspects such as purge gas optimization studies and flare gas recovery systems evaluations. He earned a BS degree in chemical engineering from King Fahd University of Petroleum and Minerals (KFUPM).
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

