Schultes, M.
How sensitive is your treating plant to operating conditions?
A normal expectation in the course of operating an amine treating plant for acid gas removal is that small changes in operating conditions will result in correspondingly small responses in plant performance. However, such expectations are not always well founded. To establish credibility for the process simulator used in the design of a new LNG plant, the mass-transfer rate-based simulation results for the new plant are compared with performance data from an operating LNG plant.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Bureau Veritas grants AiPs for IMODCO’s portfolio of jetty-less solutions for new energies transfers 5/21
- Emerson’s ‘Project Beyond’ to modernize and seamlessly integrate the industrial automation technology stack 5/20
- Neste starts SAF production at its Rotterdam refinery 5/20
- ADNOC and EGA sign $500-MM deal to localize supply of key raw material in aluminum production 5/20
- hte and Heraeus Precious Metals collaborate on catalytic ammonia cracking 5/20
- HPCL aims to start crude unit at 9-MMtpy Rajasthan refinery (India) in October 5/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction