Gonzalez, F.
Frankllin Gonzalez is the Process Engineering Team Leader for OQ Sohar Refinery. He holds an MS degree in chemical engineering and graduated from IFP School. Gonzalez has more than 15 yr of experience in refining spent at the Cardon Refinery PDVSA and Sohar Refinery, where his roles have included Hydrotreating Process Engineer, FCC/RFCC Process Engineer and operation head positions. He has operations and engineering experience in FCCU/RFCCU, distillation and hydrotreating. Gonzalez joined OQ in 2017 and has been involved in many revamps, commissioning and troubleshooting throughout his career.
A successful case of resid-to-propylene maximization using premium catalyst technology
The world has experienced profound changes throughout the global disruption created by the COVID-19 pandemic.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 refineries to run between low to mid 90% range capacity in Q4 2024 10/29
- Sumitomo Chemical begins study to optimize operations at Keiyo Ethylene 10/29
- Refiner Phillips 66 reports 3Q profit beat on midstream, chemicals strength 10/29
- Canada's renewable diesel projects hit by U.S. import surge 10/29
- Enterprise opens new facility in Utah to expand strategic fuel storage 10/29
- Angola's Cabinda oil refinery to start up by April 10/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction