van Diessen, S.
Stefan van Diessen has a professional background in product and process design and development, as well as in EPC contracting in the process industries. He is a product manager in process safety for Netherlocks Safety Systems and SMITH Flow Control Ltd. and has held leadership roles in product and business development. Safety systems are his core focus. Mr. van Diessen holds an MSc degree in mechanical engineering from the Eindhoven University of Technology, and an MSc from Nyenrode Business Universiteit.
Managing complex changeover processes for integrated cracking furnace safety
Cracking furnace operations (e.g., for the steam cracking of naphtha feedstock into olefins) are an essential part of hydrocarbon (HC) refining; however, they are known to be potentially dangerous and complex to manage.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- IHI, Vopak to launch ammonia terminal project in Japan 7/11
- India's BPCL plans to shut Bina refinery unit for 15-day maintenance in August 7/11
- Soaring electric truck sales deal new blow to diesel use in China 7/11
- Russia`s Tatneft launches new hydrocracking unit on TANECO refinery 7/11
- IEA: Global oil market may be tighter than it looks 7/11
- India must boost its petchem output to counter China's dominance, Reliance says 7/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction