Schnittker, D.
Dour Schnittker is the VP of engineering at KP Engineering and has vast experience serving in technical and leadership roles in the downstream sector spanning 43 yr. He began his career at Placid Oil Co. in 1977 and transitioned to CB&I, where he led global project management before joining KP Engineering in 2017. Mr. Schnittker earned a BS degree in chemical engineering from Texas A&M University.
Renewable diesel: The latest buzzword in the downstream sector
Renewable diesel: this greener, cleaner fuel has taken our industry by storm.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- CNOOC completes construction on $2.9-B, 1.8-MMtpy integrated complex in east China 8/22
- bp's Whiting refinery (U.S.) continues to flare days after severe thunderstorm 8/22
- Bachmann introduces latest version M-Target for Simulink 8/22
- U.S. to rule on biofuel waivers, but big oil refiners may need to wait 8/22
- Chinese independent refiner Hongrun buys Canadian, Brazilian crude 8/22
- Ukrainian attack suspends Russian oil flows to Hungary, Slovakia 8/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction