Kang, D.-H.
Dal-Ho Kang is the executive vice president and refinery manager for the Hyundai Oilbank Daesan refinery in South Korea. He has over 30 years of experience with the company and previously held roles in technical services, projects and operations, and as head of research and development. He earned a BS degree and an MS degree in chemical engineering from Yonsei University in Seoul.
Unlock next-level hydrocracker flexibility in today’s turbulent markets
Catalysts
/ Naphtha
/ Petrochemicals
/ Engineering & Design
/ Hydrocracking
/ Hydrogen
/ Process Optimization
/ Refining
/ Treating
As a critical catalytic conversion unit, the hydrocracker provides refiners with valuable feedstock and product slate flexibility.
- 1
- ... 1 pages
Current Digital Edition
![](/media/nkzcuz2h/hp-june-2024-process-optimization.jpg?width=100)
Sign up to Receive Our Newsletter
Latest News
- Petrobras wrapping up due diligence to buy back refinery from Mubadala 7/26
- US court rejects EPA denials of 2022 small refinery biofuel waivers 7/26
- Mexico seeks more 2025 fuel import deals after refinery delays 7/26
- PETRONAS, Eni and Euglena reach FID to construct a biorefinery in Malaysia 7/26
- ExxonMobil signs carbon capture agreement with CF Industries in Mississippi (U.S,) 7/26
- WoodMac: LNG truck sales impacting Chinese road diesel demand 7/26
- Digital Exclusive: SPECIAL FOCUS: Digital Technologies—Utilize process simulation digital twin to optimize condensate yield
- Digital Exclusive-Flare system design: Liquid pockets in flare headers
- Hydrogen-rich content gasoline: A new concept for paraffinic gasoline reformulation
- Alarm rationalization at Kuwait National Petroleum Company (KNPC) refineries
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction