Trivedi, U. B.
Usha B. Trivedi is a Technical Writer at Hi-Tech CADD Services. She is a qualified mechanical engineer and contributes in-depth articles for industrial equipment, processing plants and fabrication sector. Her contributions are primarily focused on enabling engineering professionals, fabricators and plant owners to accelerate design and improve project efficiencies through BIM, 3D CAD and CAE tools.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Diamond Green Diesel approves a SAF project at Port Arthur, Texas (U.S.) 4/26
- Wartsila secures China’s largest-ever methanol newbuild order 4/26
- Aspen Technology introduces new strategic planning for sustainability pathways solution 4/26
- Imperial Oil gets Q1 boost from higher production; refining throughput weighs 4/26
- KBR's phenol technology selected by SABIC Fujian Petrochemicals 4/25
- Honeywell Technology helping to produce SAF with lower cost and waste 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction