Martin, G.
Gary R. Martin is Business Development Manager of Refining Technologies with GTC Technology US LLC. He has been involved in revamps, including conceptual process design and process design packages for large capital revamps, optimization and troubleshooting services to the refining industry worldwide. He previously was President of Process Consulting Services Inc. and worked for Total Petroleum, El Paso Refining and Glitsch Inc. He holds a BS degree in chemical engineering from Oklahoma State University.
Heavy crude oil processing design and reliability
Maintenance & Reliability
/ Acid Gas Removal
/ Corrosion
/ Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrogen
/ Process Optimization
/ Piping
/ Refining
/ Reactors
/ Safety
/ Treating
/ Sulfur
Revamping refineries to process heavier crude slates goes well beyond the requirements to meet equipment performance dictated by a shift in the quantity of lighter product yields to heavier products.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Brazil's Petrobras to invest $4.8 B in integration between Reduc refinery and Boaventura complex 7/8
- Braskem completes first sale of circular polyethylene in South America 7/8
- bp's 440,000-bpd refinery in Whiting, Indiana (U.S.), reported flaring due to operational conditions 7/8
- UK's insolvent Lindsey oil refinery secures some crude supply to keep running for now 7/8
- Brazil's energy minister hints at possible fuel price cuts 7/8
- Marathon Galveston Bay refinery (U.S.) hydrotreater to remain shut until September 7/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction