Oude, J. E.
Jelle Ernst Oude Lenferink is the Director of Process Engineering at Fluor in Amsterdam. With 20 yr of experience, he has been leading conceptual studies, FEED and EPC projects, ranging from refinery projects involving hydrocracker technologies to petrochemicals and renewables projects. He studied chemical engineering at the University of Groningen in the Netherlands, and has completed post-graduate work in process design and development at the University of Twente in the Netherlands.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Carbon capture tops agenda at GPAE Conference 2025 6/17
- INEOS to cease phenol production at German site, cites high European energy costs and CO2 tax policy 6/17
- Petrobras signs $892 MM in contracts to complete RNEST Train 2 refinery expansion 6/17
- China's May refinery throughput at 9-month low on plant overhauls (1) 6/17
- bp completes turnaround work at 250,000-bpd refinery in Washington (U.S.) 6/17
- Japan's Eneos restarts 77,000-bpd Kawasaki CDU after unplanned shutdown 6/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction