Omota, F.
Florin Omota is a Senior Process Engineering Manager at Fluor in Amsterdam. He joined Fluor in 2005, where he is recognized as a subject matter expert in process control. In 2018, he became a Certified Functional Safety Expert by Exida. He also worked as Chief Engineer in an ether glycol and derivatives plant at Chimopar SA in Bucharest, Romania. In 1999, he joined the Chemical Engineering Department at the University of Amsterdam as a researcher in process simulation and reactive distillation. He holds a PhD in catalyst modification, slurry reactor performance improvement and scale-up.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fire at Tupras oil refinery in Turkey wounds 12 11/5
- Thai SCG halts operations at $5.4-B Vietnam petrochemical complex 11/5
- Solvay licenses hydrogen peroxide process technology to North Huajin Refining and Petrochemical Company 11/5
- ADNOC, AIQ developing first-of-a-kind agentic AI solution for global energy transformation 11/4
- SEEC to use thyssenkrupp nucera’s electrolyzer for caustic soda production 11/4
- Oman's OQ to list up to 49% stake in methanol, ammonia and LPG arm 11/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction