Omota, F.
Florin Omota is a Senior Process Engineering Manager at Fluor in Amsterdam. He joined Fluor in 2005, where he is recognized as a subject matter expert in process control. In 2018, he became a Certified Functional Safety Expert by Exida. He also worked as Chief Engineer in an ether glycol and derivatives plant at Chimopar SA in Bucharest, Romania. In 1999, he joined the Chemical Engineering Department at the University of Amsterdam as a researcher in process simulation and reactive distillation. He holds a PhD in catalyst modification, slurry reactor performance improvement and scale-up.
Steam generator in a hydrocracker high-pressure loop—why not?
Environment & Safety
/ Refining
/ Engineering & Design
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Safety
Historically, there has been a perception in the industry that it is not safe to include a steam generator in the high-pressure loop of a hydrocracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction