Lenferink, J. E. O.
Jelle Ernst Oude Lenferink is a process engineering manager with 16 years of experience at Fluor in Amsterdam, The Netherlands, and has been leading several hydrocracker projects. He is also a specialist in distillation technology. He studied chemical engineering at the University of Groningen, The Netherlands, and completed a post-graduate degree in process design and development from the University of Twente, The Netherlands.
Design pressure reduction in high-pressure heat exchangers with dynamic simulation
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Heat Transfer
/ Loss Prevention
/ Safety
A commercial simulation tool is used to carry out the analysis of the transient phenomena caused by the tube rupture event during the design phase of an HP heat exchanger.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF introduces BDO, THF, PolyTHF and NMP product variants with reduced product carbon footprint 3/9
- Equilibrion and Rolls-Royce sign MoU to advance SAF using nuclear energy 3/9
- Iverson eFuels to discontinue green ammonia project in Norway due to grid capacity 3/9
- Hypersonix’s DART AE completes its first flight, reaching hypersonic speeds 3/9
- U.S. fuel exports see slight uptick in 2025 3/9
- South Australia to host HAMR Energy’s first-of-its kind methanol-to-jet fuel facility 3/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

