Chaudhuri, D.
Debopam Chaudhuri is a Senior Process Specialist for Fluor in New Delhi, India and a subject matter expert of sulfur recovery processes. He has more than 21 yr of experience in petroleum refining, petrochemical complexes and upstream projects. Chaudhuri earned BTech degrees in chemistry and chemical engineering from the University of Calcutta.
The heavy toll on sulfur blocks
The tightening of environmental norms and emissions specifications provides additional challenges to refining.
Raising the alarm: Understanding the operator’s perspective on refinery process alarms
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Refining
/ Environment
/ Equipment
/ Information Systems
/ People
/ Safety
As refineries and petrochemical complexes worldwide are moving toward more automated operations, plant operators are increasingly becoming dependent on process alarms for safe, smooth and continuous operation.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. EPA to remove proposed EV volumes from biofuel blending rule 6/6
- BASF increases alkoxylates production capacity in Europe 6/6
- Russia's Sakhalin invites India and China to tap energy resources 6/6
- Airlines urge co-operation to help curb emissions 6/6
- Oil prices steady as economic fears offset Saudi output cut 6/6
- U.S. diesel demand is falling despite economic growth 6/6
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction