Singh, N.
Naresh K. Singh is a Process Engineer for Fluor India. He has more than 29 yr of experience in refining, petrochemical, chemical, gas processing and LNG regasification projects, executing feasibility studies, conceptual engineering, licensor evaluation, FEED and detailed engineering projects. Singh earned his BS degree from the Indian Institute of Technology Roorkee.
Decarbonization opportunities in refinery and petrochemical complex-organic Rankine cycles
AI
/ Digital Technologies
/ Engineering & Design
/ Equipment
/ Information Systems
/ Management
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
In an organization’s pursuit of decarbonization, significant opportunities exist in recovering waste heat from high-temperature streams instead of rejecting it to heat sinks. This article analyzes the economics of using the organic Rankine cycle (ORC) to recover waste heat and generate electricity.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

