Laturkar, K.
Kaustubh Laturkar works as an Engineer at the Facility for Rare Isotope Beams, a U.S. Department of Energy (DOE) project in Michigan. He has more than 9 yr of experience working in the field of process engineering, refinery operations, utility systems design and operation, with a special focus on design and commissioning of engineering systems. Laturkar earned an MS degree in chemical engineering from University of Florida and a BE degree in chemical engineering from Panjab University, Chandigarh, India. The author can be reached at kos19188@gmail.com.
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
Ethanol and benzene extractive distillation simulation on DWSIM utilizing p-xylene as solvent
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Colombia's Ecopetrol to invest up to $700 MM in SAF production plant 4/2
- Ergon to invest $400 MM to expand gasoline production at Vicksburg refinery (U.S.) 4/2
- DB Schenker to use Neste's renewable diesel to decarbonize logistics in Asia 4/2
- U.S. EPA's upcoming proposal on biofuel blending mandates to cover two years 4/2
- ExxonMobil to invest more than $100 MM in Baton Rouge upgrade to produce high-purity isopropyl alcohol 4/2
- Stockholm Exergi to begin building one of the world's largest carbon capture projects using CATACARB Enhanced HPC 4/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction