Hormazábal, C.
Claudio Hormazábal is a Project Director with more than 20 yr of experience as a chemical engineer. He has spent 16 yr of his career with ENAP. He had the opportunity to serve as the Operational Team Leader for the coker complex project and the alky complex, reviewing engineering, training operators, and commissioning and starting up the complexes. He also served as the Coker/Alky Manager for 11 yr. Mr. Hormazábal earned a BS degree in chemical engineering, an MBA from Adolfo Ibañez University and an International Coaching Neurolinguistics Certification.
Reframe to boost innovation: Increase operational flexibility in the coker gas treatment unit
Often, when challenges are presented within tight time constraints, the industry can jump to a solution without proper analysis: “Don’t bring me problems, bring me solutions."
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Colombia's Ecopetrol to invest up to $700 MM in SAF production plant 4/2
- Ergon to invest $400 MM to expand gasoline production at Vicksburg refinery (U.S.) 4/2
- DB Schenker to use Neste's renewable diesel to decarbonize logistics in Asia 4/2
- U.S. EPA's upcoming proposal on biofuel blending mandates to cover two years 4/2
- ExxonMobil to invest more than $100 MM in Baton Rouge upgrade to produce high-purity isopropyl alcohol 4/2
- Stockholm Exergi to begin building one of the world's largest carbon capture projects using CATACARB Enhanced HPC 4/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction